Multidisciplinary Hospital for Active Treatment “Heart and Brain“
After the successful completion of the first three wings – North Wing, Expansion, and Oncology Wing of the 'Heart and Brain' hospital complex in Pleven at the end of 2022, “Trade League - GATS" finalized the new “Mom and Me“ wing. The investor's initiative was triggered by alarming data from the World Bank indicating that in 2020, the child mortality rate in Bulgaria (for children under 5 years) was one of the highest in the EU – 6 children per 1,000 births. The “Mom and Me“ wing includes specialized departments for maternal and child health care - obstetrics, maternity ward, gynecology, pediatrics, and neonatology. The building also houses departments for endocrinology, rheumatology, clinical hematology, urology, hemodialysis, and gastroenterology. The Operating Block's capacity is expanded with four new operating rooms, making a total of eighteen operating theaters in the complex. Completed in just 12 months, the new wing has two hundred hospital beds, while the entire hospital complex has over seven hundred beds. 'Mom and Me' is located north of the first North Wing, completed in 2016, and is an 8-story building with a basement. The total built-up area on all floors is 9,000 square meters, with a total built-up area of over 27,000 square meters for the entire hospital complex. The new wing harmoniously complements the existing 'P'-shaped composition of the complex, using the same materials and colors. Brighter colors are used in the interior due to the presence of children's departments. The facade of the building is constructed using Baumit Integrated Thermal Insulation System Pro and final coatings PuraTop and SiliconTop K2 and K3. The colors used are 0891 - plinth, 0018, 0874.
Baumit insulation system
BAUMIT POWERSYSTEM
Baumit Materials
- ProContact / ProContact DC 56
- Nivello Quattro
- SilikonTop
- PuraTop
- MultiWhite
Further Baumit products
Baumit Nivello Quattro